It seems to be only a matter of hours. After weeks, the life of the citizens of Sibari should return to normal and leave the water emergency behind. The works for the construction of the new well located in via Archimede were officially completed and the first chemical analyzes carried out on the water taken have given positive results: the water is drinkable. Now the final checks and connections to the network are expected, the last steps before the return to normal, scheduled for a few days. The path to get to this result was far from simple. Sibari has experienced a situation of serious emergency, with serious disservices and insufficient supplies. The emergency also poured into agriculture.
The complete article is available on the paper and digital edition