From the “positioning and putting in function of 13 wells” in the area of the former “Kroton Gres 2000 Ceramic industries” area to the “issue of the certificate of reclamation” for the arrangement of the hydraulic barrier of the POB PHASE 1 by the province of Crotone. And then: the study and the subsequent “realization of the alternative emergency road network to via Leonardo da Vinci” which will lead, in all probability, to the use of via Avogadro to continue the excavations started by Eni Rewind, owner of the polluted sites, to remove the waste from the two seaside landfills of the former industrial area. Emilio Errigo, extraordinary commissioner of the Sin di Crotone, a snapshot of the various reclamation proceedings starts. And it does so in its third half-yearly report (November 2024-April 2025) in which it lists the works of environmental remediation, in progress or during processing, which is coordinating in implementation of the plan of interventions 2024-2026.
The complete article is available on the paper and digital edition