The reclamation of the new port of Crotone, the green light of the Mase in Eni Rewind

John

By John

Green disc on the characterization plan of Eni Rewind to reclaim the area of ​​the bank of Riva del Porto Nuovo di Crotone with a catalyzed hydraulic conglomerate (CIC), waste of industrial production from the former Pertusola Sud factory. The green light came from the Ministry of the Environment and Energy Safety at the conclusion of the Conference of Services Decided launched on June 16. At the same time, the Mase has ordered a series of prescriptions that the Eni company will have to comply in carrying out the investigations in an extended area 6,700 square meters which is part of the Sin di Crotone.
The complete article is available on the paper and digital edition