Eni Rewind is ready to reclaim the area of the bank of Riva del Porto Nuovo di Crotone with a catalyst hydraulic conglomerate (Cic) as the province has ordered. That’s why the Eni group company presented a characterization plan of the extended area 6,700 square meters, which is part of the Sin di Crotone.
The goal is twofold: on the one hand to define the extension of the site, enclosed between the Giunti pier, the forane pier and via Miscello da Ripe, which must be restored by the waste from industrial production; And on the other to establish the exact volumes of CIC who are piled up in the area.
The complete article is available on the paper and digital edition