The CAS announces that, from 6am on 2nd September until 8pm on 27th, for the execution of safety works on the motorway section near the Letojanni tunnel (reopened a few weeks ago, 9 years after the landslide and immediately “protagonist” of a flood), the partialisation of the carriageway was ordered by alternating the closure of the emergency, driving or overtaking lane, as required, of the A/18 ME – CT motorway, in the section between km 32+000 and km 34+000 in both directions, both during the day and at night.
On the same motorway sections, a maximum speed limit of 60 km/h and a ban on overtaking have been established. Caution is recommended when using the motorway section.