The safety and cleaning works of the burner and the ditches of drains in the municipal area began. It is Possible interventions, from the first year of the settlement of this majority, thanks to the profitable collaboration between the municipal administration of Botricello and the reclamation consortium.
The first safety work was carried out in the Santa Maria district, an agricultural area at high risk flooding, on which the municipal body is increasingly paying attention. A sign strongly desired by both institutions involved, which intended to demonstrate the will to recover in a tangible way to this area. The second intervention concerned the ravine in via Zaccagnini/Carioca village, considering that it is one of the main ditches that cross the country.
In the next few days, further works are planned on all the main burners in the country.
The mayor Saverio Simone Puccio He expressed words of appreciation for the profitable collaboration with the Consortium, which lasts from the beginning of the legislature: “The reclamation consortium has always shown great attention to the territory and for Botricello in particular, for this reason I can only express an applause against all the components. There is a real and profound attention that translates into prevention and cleaning interventions that are making their fruits. That the hydrogeological structure of our territory needs targeted actions and concrete interventions.