The stretch of seafront previously closed to traffic will reopen to traffic on days not affected by the works to allow construction activities on the bridge over the Fiumarella. The municipal councilor responsible for traffic, Gregorio Buccolieri, announced this, specifying that, with a specific ordinance from the local police, it was decided to regulate the traffic by allowing vehicular transit in the affected area during the time slots and days in which the roadway is not affected by the works.
The road will be accessible from this evening until Sunday 16 November. In the next week, traffic will be open as normal with the exception of Tuesday 18 and Friday 21 November, from 6 am to 12 pm. To allow adequate information to drivers, the company carrying out the works must also pre-signal the days and times during which road traffic is prohibited on the construction site area in the following points: SS106 intersection Via Murano, both sides of the road; Via Murano intersection Via Lungomare Pugliese, at the stop sign in the left lane towards Porto; Lungomare Pugliese intersection with Via Repubbliche Marinare.